
NATCHITOCHES, La. (Sept. 18, 2026) — The City of Natchitoches will conduct fire hydrant flushing and flow testing throughout East Natchitoches beginning Monday, Sept. 21, and continuing through Sept. 25.
City officials said hydrants will be fully opened to flush water through the system and remove accumulated sediment. Crews will also use the process to evaluate hydrant performance and measure water flow rates.
Residents may notice temporary discoloration in water during the testing period. The maintenance is part of the city’s ongoing efforts to ensure the reliability of the water distribution system and fire protection infrastructure.

















